Company News
Inside the Quality Inspection Team: How a Batch Gets Released
From the first panel check to the container seal: the steps a batch passes before it leaves the factory.
LUMORA Quality Team · Jan 15, 2026 · 4 min read

Company News
From the first panel check to the container seal: the steps a batch passes before it leaves the factory.
LUMORA Quality Team · Jan 15, 2026 · 4 min read

Before a run starts, the first unit is measured against the approved sample. Dimensions, finish and hardware are recorded and compared, not judged by eye.
Inspectors visit during production. Catching a drift in edge banding or finish on day two is far cheaper than rejecting a completed batch.
Need help with this stage of the project?
Talk to Our TeamThe final inspection covers quantity, packing method and protection. The container is sealed only after the report is signed and shared with the client.